At last I have the three new blades carved, balanced and painted up. The Hydraulic Ram has been moved under the mast.
I discovered that pushing is more efficient than pulling, and it proved correct.
Using my compact tractor and a light push up on the mast up it went.
The ram can be seen on the right, however, because it would not extend to raise the mast through 90 degrees, I put a rope with a 2:1 purchase on the upper wire guy rope to pull it up the last 20 degrees or so by hand,
which proved to be very easy to do.
Magic!

2012-03-22

Disaster Strikes!......
On getting up today the turbine could be seen to be vibrating badly. I thought the balance weight had fallen off, but on stopping the machine I could see two of the blades had broken overnight. The maximum wind had only been about 12 knots.
I found the tip of one blade which revealed the problem (see closeup photo on the right). The blades had hit one of the wires. I know they are close, but not that close! They must have flexed somehow to hit a wire.
I will have to take it all down, extend the mast a little and make two new blades. Watch this space.........

2012-03-19

The blades were attached and we were ready to hoist. Unfortunately my tractor refused to lift the mast with the weight of the turbine on the top. We managed to get a neighbour with a bigger tractor to come over (Many thanks indeed to Doni and Michael), but the bigger tractor would not lift it either! We resorted to the tractor and man power, and up it went!
The cables were connected, and having tightened up the guy wires, we switched the brake off and away it went. In around 10+ knots of breeze it is producing over 250 watts. Not bad! The software for monitoring the output is working, but does need some tweeking, so nothing ready to go up on the net yet.

2012-03-19

The mast base is in place, and mast is back from galvanizing, so was fitted on 18th and all the wire guy ropes set up. It was an easy job with the hydraulic ram to raise and lower the mast using my compact tractor.
On the 19th the turbine was placed on the top with the cables running down the mast as can be seen on the right here.

2012-02-19

Wooden shuttering in place for the concrete base has metal reinforcing drilled into the rock to hold the mast nice and steady.
On the right is the mast undergoing testing in the yard up at the forge.
I am using a hydrolic ram to raise and lower it powered by the tractor.
We tested the mast with JJ who weighs 75kg hanging on the top, and it went up with no problem.
The mast will be galvanised and have wire guy ropes for support.

2012-02-22

Holes are drilled into the rock for the guy wires. Mike is busy squirting the Chemical Fixing prior to knocking the metal loops into place.

2012-02-21

Now for the ground work. Fortunately I was able to find a position about 30 metres from the house where a concrete base could be made for the mast, and the fixings for the wire guy ropes could be put directly into the rock. On the left is the site looking west across Dunmannus Bay into the Atlantic Ocean.
It should be windy enough! On the right Dan is busy getting the levels correct using a laser gismo.

2012-02-18

The Turbine Control and Monitor is finished. On the left is the outside showing the Brake Switch, AC Volts, DC Amps, DC Volts and LCD from the Arduino Monitor. The wind speed at the time was about 4 m/sec (8 knots) Inside the unit the LDR 48-30 controller is in the middle with the PSU for the Arduino and the Arduino 'Stack' bottom right. The rectifiers are just out of shot on the far left of the pictures fixed to a big heat sink.

2012-02-14

All balanced and painted up the finished turbine is on the big stand for testing once the electronics have been done.

2012-01-31

The Blades are fully finished and put onto the Turbine Assembly for the first time, ready for balancing. Thanks to Belinda for her help.